REQUEST FOR DVBE SUBCONTRACTOR AND SUPPLIER BIDS – Paradise High School Gymnasium
Request for Proposal
Project # 18125
Re: Paradise High School Gymnasium (PHS Gym)
Paradise, Ca.
OPS Project ID: NOPS19‐02109
REQUEST FOR DVBE SUBCONTRACTOR AND SUPPLIER BIDS
Scope – Construction of a new 15k sqft high school gymnasium at the existing Paradise High School Campus, with related lobby, restrooms, snack bar, & locker rooms, site fire lane & parking improvements. Accessible parking, drop off, & path of travel improvements. Underground infrastructure to serve the project including; waste, water, & gas connections, above & underground pathways for fire alarm & data. ALL TRADES REQUIRED.
Site Meeting- 6/12/2019 @ 1:30pm 5911 Maxwell Dr. Paradise, Ca.
Wage Rates- Bids shall incorporate the prevailing hourly rate of per diem wages for this locality and project as determined by the Director of Industrial Relations pursuant to Labor Code Section(s) 1771, 1775, 1776, 1777.5, 1813 and 1813 a copy of which may be accessed on the Internet at http://www.dir.ca.gov/OPRL/PWD/ and is hereby made a part of this notice by reference as though fully set forth herein. When you get to this website, select “Prevailing Wage Determinations”.
Alternates- (4)
- Alternate No. 1 (Additive): Provide storage room and added parapet roof per contract drawings.
- Alternate No. 2 (Additive): Provide steel canopy at CMU building exit doors.
- Alternate No. 3 (Additive): Provide steel canopy at locker room entrance.
- Alternate No. 4 (Additive): Provide lockers and accessible benches in Boy’s Locker 110 and in Girls Locker 115 as shown in drawings.
DVBE Participation has been set at 3% for this solicitation. DVBE vendors are encouraged to participate.
All requests for information (RFI’s) should be directed at furio@nmrdesign.com no later than 6/26/2019 @ 2:00pm.
Plans, specifications & addenda are available at https://www.dropbox.com/sh/93pq9kli8svf7rt/AABDb0xHMRnhL1Z9YxTVGWESa?dl=0 or plans may be purchased Metagraphics, Chico (530) 343-3004.
Subcontractors can submit scope letters no later than 6/24/2019 @ 12:00 pm.
Subcontractors can submit proposal’s no later than 7/3/2019 @ 11:00 am.
Submit your Proposal & Scope letter to jim@slaterandson.com